Design and Construction of the Shinas Link (Wilayat Shinas)
Start Date: 30 September 2022
End Date: 01 March 2023
Objective: Establish a road link connecting Wilayat Shinas with the Al Batinah Expressway.
Importance: Facilitate smoother traffic flow to and from Wilayat Shinas, while reducing pressure on internal roads.
Scope: Construction of a dual carriageway link built to modern standards, possibly including bridges or intersections to ensure smooth traffic movement.
Related Projects
Discover NowAddition of the Third and Fourth Lanes on the Rusayl–Nizwa Road (Phase One)
Start Date: 01 March 2023
End Date: 07 March 2024
Khazaen Link Road
Start Date: 01 July 2023
End Date: 29 September 2024
Dibba – Lima – Khasab Road (Sultan Faisal bin Turki Road)
Start Date: 24 June 2024